Indigenous Production by DRDO

There are 56 ongoing Mission Mode (MM) Projects with a cost of Rs 49424.54 cr. and 218 ongoing Technology Demonstration (TD) mode projects with a cost of Rs 13427.45 cr.

Above projects are directed for 100 percent indigenous productions, however a few projects have collaboration with foreign countries during development phase.

This information was given by Raksha Rajya Mantri Shri Shripad Naik in a written reply to Shri Tiruchi Siva in Rajya Sabha today.